Building B1- Project update
Date: 16-02-2012
We are installing formwork metal reinforcement, before we lay the concrete slab.
New concrete slab being poured, on 5th floor.
Date: 13-01-2012
Date: 22-12-2011
Installing formwork in preparation for concrete pour, to floor slab to level 4 ( building B-1 )